Red Flag Warning expires at 10:00 AM on 6/20, issued at 10:00 AM Maricopa, CA

What is being built near Campus Park?

Set Text Size SmallSet Text Size MediumSet Text Size LargeSet Text Size X-Large
Share
Updated: 5/04/2012 6:54 pm
Lynn contacted 17 News. She wants to know what is being built in the neighborhood of Campus Park.

Bakersfield Assistant Public Works Director Brad Underwood says a storm drain modification and expansion is being built in the Pin Oak Park area.

Trench shielding will be used as part of the construction and will be stored in the park bordering Carvalho Street.

A temporary fence will be placed around the equipment and will be monitored at various times.
Share
0 Comment(s)
Comments: Show | Hide

Here are the most recent story comments.View All

The views expressed here do not necessarily represent those of KGET TV 17 - In the Spirit of the Golden Empire

No comments yet!
Bakersfield Current Conditions
58° High: 86°  |  Low: 53°
Clear
Inergize Digital This site is hosted and managed by Inergize Digital.
Mobile advertising for this site is available on Local Ad Buy.